| O'Keefe Family Website | ||
|
|
||
Construction of the New Sunset Beach, NC, Bridge
Jo O'Keefe Copyright 2011 All Rights Reserved

See Sunset Beach Bridges video: http://www.wral.com/lifestyles/travel/video/9008720/#/vid9008720
|
The new Sunset Beach
Bridge opened at 3:10 PM on November 11, 2010. Over 500 feet of additional
marsh was established through removal of portions of the original causeway.
Infiltration basins on the island and mainland ends capture run-off
from the bridge to prevent chemicals from polluting the water.
|
||